Introduction of PE plastic steel winding pipe equipment and

Release time:2018-10-22 13:34

Polyethylene plastic steel wound pipe (SRWPE) is made of steel-plastic composite profiled strip by spiral wound welding (extrusion welding on lap surface). Its inner wall is smooth and smooth, the specification is DN200-DN2600mm. This kind of pipe has the advantages of corrosion resistance, light weight, easy installation, large flow rate and long life (50 years). It can replace the pipes made of high energy-consuming materials (cement, cast iron, ceramics, etc.). It is an environmental friendly green product.
1. Because plastic steel pipe is a new type of structural wall pipe, there is no uniform construction method standard in China. This paper introduces its construction method according to the technical data and construction specifications provided by the manufacturers, that is, trench excavation, construction drainage, foundation construction, pipeline laying, connection, closed water test and backfill. Deformation detection and control.
1.1. Trench excavation
The form of trench is determined according to construction site environment, groundwater level, soil condition, construction equipment and seasonal influence. The height of the base should be strictly controlled and the base surface should not be disturbed. The undisturbed soil above the design elevation of 0.2-0.3 m should be retained and cleaned up manually to the design elevation before piping. When over-excavation or disturbance occurs, natural graded sand and stone or crushed stone with a maximum diameter of less than 40 mm can be replaced and compacted.
1.2. Construction drainage
When the construction needs to reduce the groundwater level, the following requirements should be met: 1) Drainage pipe near the building, when reducing the groundwater level, preventive measures should be taken to prevent the impact on nearby buildings; 2) The method of reducing the groundwater level should be selected according to the permeability of the soil layer, precipitation depth, equipment conditions and so on.


聚乙烯塑鋼纏繞管設(shè)備

Teachers of polyethylene plastic steel winding pipe equipment manufacturers also mentioned that the quality of construction dewatering should meet the following requirements: 1. No water in grooves, no water construction. The groundwater level should be lowered to 0.5 m below the bottom of the trench; 2. The groundwater level should be lowered to 0.5 m below the bottom of the trench in areas where the groundwater level is higher than the elevation at the bottom of the trench excavated; and the groundwater level should not be lowered after the pipeline is laid. When the pipeline is stable, the groundwater can be stopped.
1.3. Foundation construction
For general soil, a medium-coarse sand foundation layer with a thickness of 100 mm should be laid on the undisturbed soil foundation below the pipe bottom or on the backfilled and tamped foundation; when the soil quality is poor, a gravel foundation layer with a thickness of not less than 200 mm can be used, or it can be laid in two layers. The gravel with a diameter of 5-32 mm and a thickness of 100-150 mm can be used in the lower layer. The upper layer of coarse sand is not less than 50 mm thick. For soft soil foundation, when the bearing capacity of foundation is less than the design requirement or because of dewatering during construction, the undisturbed soil of foundation is disturbed and affects the bearing capacity of foundation, the foundation must be strengthened first, and then the medium coarse sand foundation layer should be laid after reaching the required bearing capacity. The foundation should be strengthened before the pipeline is laid when the pipeline may cause the longitudinal uneven settlement due to the pipeline load and soil change.
1.4. Pipe laying and connection
The ends of the two tubes to be connected are aligned and coaxial as far as possible. The electro-thermal melting strip is laid on the inner wall of the two tubes with supporting tools. The electro-thermal melting strip lapping interface and connection post should be located above the tubes. The supporting machine is opened to support the electro-thermal melting strip and press it on the inner wall of the tubes evenly. All the pressure plates of the machines should be neat. There is no omission to cover the hot melt zone. The hot melt welding machine (power supply) is connected with the electric heating circuit of the hot melt, and the electric heating welding is carried out according to the welding parameters such as the current and the power-on time provided by the pipe manufacturer. After welding, the machine is cooled naturally (usually more than 40 minutes). During the cooling process, the welding tool is not allowed to move, and the joint is not affected by external force. After cooling, the machine can be removed.


Tel

Top

无码人妻一区二区三区线花季转件 | 污污污污污污污污在线观看视频 | 菊花被干高潮内设网站免费看 | 性做爰A片欧美激情艳妇20p | 日本精品久久久久中文人妻 | 少妇又色又爽又紧又刺激在线视频 | 免费无码婬片AAAA片直播表情 | 午夜丰满极品美女A片 | 91午夜人妻人人做人爽 | 少妇白浆无码喷水91 | 无码AⅤ一区二区三区 | 污网站高清无码在线观看 | 37p粉嫩大胆色噜噜噜 | 亚洲国产91精品A∨无码 | 污污视频在线免费观看 | 人妻边打电话边被躁91 | 人人妻人人澡人人爽人人视频 | 国产乱妇乱子在线播放视频国产 | 免费观看BBB毛片大全 | 国产寡妇婬乱A毛片视频中文 | 奥田咲 影音先锋 亚洲一区 | 成人视频免费在线观看 | 中文字幕一区二区四区 | 污污污视频在线观看网站在线观看网站 | 黄色成人网站在线浏览 | 国产农村肥熟妇女A片 | 91资源超碰在线人人干 | 91成人影库一级A片 刘涛AV婬乱一级A片 | 中文字幕无码在线观看 | 少妇的嫩苞一级A片 | 少妇被又大又粗又爽毛片久久黑人 | 午夜理理伦电影A片无码残囡 | 免费一级婬片A片久久妖精97 | 精品无人无码乱码毛片国产 | 女生自慰一级看片 | 国产内射老熟女AAAA | 18禁无码毛片精品久久久久久 | 国产又粗又猛又爽又黄 | 性感白丝AV一级片 | 国产丰满熟女乱婬0000 | 麻豆柠檬视频在线播放 |